B1HG31K1 - 307 DW10TD ENGINE

REMOVAL - REFITTING INJECTOR

IMPERATIVE : do not disconnect the injector ith the engine running ; when working on the diesel circuit, follow the advice on cleanliness ; if any work is carried out on the high pressure pipes they must always be replaced .

1 - SPECIAL TOOLS


[1] Set of plugs (-).0188-T .

[2] Torque tightening kit for diesel high pressure circuit (-).1603-ZZ .

2 - REMOVAL

IMPERATIVE : before any repair : wait 30 seconds after the ignition has been switched off .

Remove the styling cover from the engine .


Disconnect :

Move aside :

Remove :


Remove the diesel return pipe (9), moving the pin away towards the outside with a screwdriver .

IMPERATIVE : blank the holes with the caps [1] ; clean the high pressure unions before slackening .


Unscrew :

Remove the fuel high pressure tube (12) from the injector to be removed .

IMPERATIVE : blank the holes with the caps [1] .


Remove :

Clean the recess of each injector .

IMPERATIVE : cover the injector recesses and the injector edges by means of the caps [1] .

3 - REFITTING

IMPERATIVE : if any work is carried out on the high pressure pipes they must always be replaced .

Remove the blanking caps [1] from the injector recesses .

Position :

Tighten :

Pre-tighten the connections (11) - (10) to 2.4 dan.m .

Tighten :

Continue the fitting operations in the reverse order to removal .

Re-prime the diesel circuit using the priming pump .

Initialise the various ECUs .

3 - 1 - LEAKAGE CHECK

Start the engine .

Check that there are no fuel leaks .