C5HG1BF1 - 307 EW10J4 ENGINE

REMOVAL - REFITTING COMPRESSOR

IMPERATIVE : before any work on the air conditioning circuit, observe the recommended precautions .

1 - SPECIAL TOOLS

[1] Air conditioning maintaining equipment : Approval number FAC.18.08 .

2 - REMOVAL

Drain the refrigerant circuit : Using the tool [1] .

Remove :

EW10J4 ENGINE

remove the ancillary drive belt .

Remove the bolt (1) .

Remove the clamp (2) .

IMPERATIVE : quickly seal the compressor inlets and outlets and the pipes .

EW10J4 ENGINE


ALL MODELS

Disconnect the compressor connector (4) .

Remove the 4 mounting bolts (3) from the compressor .

Remove the compressor .

3 - REFITTING

Tighten the fasteners to the correct torque starting with the two fasteners on the pulley side (Tightening torque 4.5 da.Nm) .

Remove the blanking pieces placed in the compressor and the pipes .

Fit the clamp (2) (Tightening of the bolt (1) to 4 daN.m) .

Fit the ancillary drive belt .

EW10J4 ENGINE

fit the ancillary drive belt .

Fill the refrigerant circuit with the correct charge for the vehicle : Using the tool [1] .

Check the operation of the refrigerant circuit .