B1FG01K1 - 607 ES9J4S ENGINE EMISSION CONTROL CEE 2000
REMOVAL - REFITTING OIL PUMP
1 - RECOMMENDED TOOLS
[1] flywheel stop (-).0153 ZX .
2 - REMOVAL
remove the timing belt .
Drain the engine oil .
Remove the clutch housing bottom closing plate .
Lock the flywheel with the stop [1] .
Disconnect the compressor electrical supply .
Unclamp the air conditioning pipe .
Move aside the air conditioning compressor (1) with its securing bracket without opening the fluid circuit .
Remove the compressor front bracket .
Remove the crankshaft setting rod .
Remove the bolt (2) .
Remove :
3 - REFITTING
NOTE : the oil pump is fitted with a composite gasket capable of withstanding removal several times; if the gasket is damaged, it can be partially repaired with SILICONE CATEGORIE 2 jointing paste .
Fit :
IMPERATIVE : finger tighten then progressively tighten the securing bolts in the order shown (1 to 14) .
Pre-tighten : 0.5 da.Nm .
Tightening torque: 0.8 da.Nm .
Check the tightening : 0.8 da.Nm .
Proceed in the reverse order to removal .
Tighten :
Tighten the bolts (6) to 4 daN.m .
Tighten the bolts (7) to 4 daN.m .
refit the timing belt .
Continue the fitting operations in the reverse order to removal .