B2CJ0UK1 - 607 ML5T GEARBOX
REFITTING INPUT AND OUTPUT SHAFTS - GEARBOX CONTROL PLATE
1 - PRELIMINARY OPERATIONS
Input shaft bearing adjustment .
2 - REFITTING
Check that the input shaft bearing race (1) is present .
Fit a new lubrication bush (2) .
Mesh the input shaft (3) with the output shaft (4) .
Fit the input and output shaft assembly .
WARNING : take care not to damage the guide tube oil seal when inserting the input shaft .
Check that 2 nd speed is engaged on the output shaft .
NOTE : when fitting the plate, position the selection anchor (5) in the groove (6) in the gear engagement shaft .
Fit the gearbox control plate (7) in the direction of the arrow (2 nd speed engaged) .
WARNING : after fitting the gearbox control plate, check that the 1 st - 2 nd and 3 rd - 4 th forks are correctly positioned in the grooves in the synchroniser sleeves .
Insert the tension pins (8) .
Fit the bolts (9) - Tightening torque 1,5 da.Nm .
Fit the spring (10) and the piston (11) .
Fit :
WARNING : check that the reverse rocking lever is correctly positioned on the selection fingers .
Fit the reverse shaft (14) and gear (15) .
Be sure to engage the sliding gear in the rocking lever, Rotate the shaft to place the shaft pin in the notch in the clutch housing (16) .