C4CH1KF1 - 607
REPLACEMENT OF THE B POST
WARNING : all the scoured areas must be protected by the approved electrolytic re-zincing process .
IMPERATIVE : observe elementary health and safety rules (wearing of filter mask for organic fumes - work in a ventilated area) .
1 - COMPLEMENTARY OPERATION(S)
Replacement :
Removal - refitting :
Remove-refit trim :
Detach the electrical harnesses .
2 - IDENTIFICATION OF REPLACEMENT PARTS
(1) Centre pillar .
(2) Centre pillar inner panel .
(3) Centre post stiffener assembly .
3 - REPLACEMENT PART COMPOSITION
(1) Centre pillar .
(2) Centre pillar inner panel .
(4) Centre pillar inner panel upper stiffener .
(5) B post upper hinge strengthener .
(6) Rear door check mounting strengthener .
(7) Tapping plate retainer .
(8) Centre pillar intermediate spacer .
(9) B post lower hinge strengthener .
(10) Lower partition .
(11) Centre pillar stiffener .
4 - PART(S) REQUIRED TO CARRY OUT THE OPERATION
Part centre stiffener .
Part "B" post inner panel .
(3) Centre post stiffener assembly .
5 - PREPARATION OF THE NEW PART
6 - CUTTING OUT
Move aside the panels (A) .
7 - RELEASING
8 - ADJUSTMENT
9 - WELDING
Engage the b post strengthener (3) between the b post inner panel and the roof bow inner panel and assemble by spot welding .
10 - FINISHING
11 - SEALING
12 - FOAM OPERATION
13 - PROTECTION